Certified payroll in one minute
- What it is: a payroll record for one project and one work week, listing each worker's classification, daily hours, rates, gross pay, deductions and net pay, plus a signed statement that the payroll is correct and that everyone was paid the prevailing wage.
- Who files it: every contractor and subcontractor with laborers and mechanics on a covered project.
- How often: on federal projects, weekly for each week in which covered work is performed (29 CFR 5.5(a)(3)(ii)(A)). State rules set their own schedules.
- Which form: the federal WH-347 or an equivalent format; New York, California, New Jersey and other states use their own electronic systems.
Regular payroll is how you pay your employees. Certified payroll uses the same numbers, reorganized into a weekly report per project and signed, so the agency paying for the project can check that the wage rules were met.
Who must submit certified payroll
Federal and federally assisted construction
The Davis-Bacon and Related Acts apply to contractors and subcontractors on federally funded or assisted contracts in excess of $2,000 for the construction, alteration, or repair (including painting and decorating) of public buildings or public works (U.S. Department of Labor). The "Related Acts" extend the same labor standards to most federally assisted construction (DOL Fact Sheet #66). See our Davis-Bacon Act guide for the full rules.
Payrolls go to the federal agency when it is a party to the contract; otherwise to the applicant, sponsor or owner, for transmission to the agency that provided the assistance (DOL WH-347 page). The prime contractor is responsible for the submission of all certified payrolls by all subcontractors (29 CFR 5.5(a)(3)(ii)(A)).
State public works
Many states have their own prevailing wage laws and certified payroll rules for state and local public works. Four examples:
| State | How certified payroll is submitted | Guide |
|---|---|---|
| New York | Electronically through the NYSDOL Certified Payroll portal since January 1, 2026, at least every 30 days (NYC public work uses the City's own system). | New York |
| California | Directly to the Labor Commissioner through DIR's eCPR system, at least monthly unless the contract requires more often. | California |
| New Jersey | Online through the New Jersey Wage Hub, required since August 15, 2024. | New Jersey |
| Illinois | A Certified Transcript of Payroll to the Illinois Department of Labor, with an import template in use since July 1, 2025, uploaded as CSV (IDOL). |
Rates and rules for each state are linked in our prevailing wage guide.
What a certified payroll report contains
The federal form, the WH-347 (Rev. January 2025), shows the information every agency expects:
- Header: contractor or subcontractor, project name and location, project or contract number, wage determination number, payroll number and the week.
- For each worker: name, an identifying number (such as the last four digits of the Social Security number), journeyworker or registered apprentice, work classification, hours worked each day, straight-time and overtime rates, gross pay, each deduction and net pay.
- Fringe benefits: what is paid to bona fide plans and what is paid in cash.
- Statement of compliance (page 2), signed by the person who paid or supervised the payment of the workers.
Every column is explained in how to fill out the WH-347, and the 2025 changes in the new WH-347 form. To see a finished report, open the certified payroll example; the fringe benefit lines are explained in what fringe pay is.
Certified payroll forms
"While use of Form WH-347 itself is optional," covered contractors must submit the payroll information weekly (DOL). In practice that means:
- The WH-347 PDF from DOL, typed or written by hand, one worker at a time.
- DOL's online fillable WH-347, available since December 2025, which prints the form or saves it as a PDF for you to submit.
- A report from payroll software with the same information and the statement of compliance, such as the Excel WH-347 in QuickBooks Workforce Elite (QuickBooks guide).
- State electronic formats: New York's XML bulk upload, California's eCPR XML and the New Jersey Wage Hub CSV templates.
PrevailReady creates the WH-347 form and the New York, California, New Jersey and Illinois files from the payroll report and timesheet you already export.
How to do certified payroll, step by step
- Get the wage determination named in the contract. It lists the minimum basic rate and fringe for each classification. Our free wage determination reader turns a SAM.gov determination into a table.
- Classify each worker by the work actually performed, using the classifications on the determination.
- Track hours by day and classification on the project. A worker in more than one classification may be paid the rate for each classification for the time actually worked in it, provided the payroll records accurately show the time spent in each (29 CFR 5.5(a)(1)(i)).
- Pay at least the prevailing wage, unconditionally and not less often than once a week (29 CFR 5.5(a)(1)(i)): the basic rate in cash plus the fringe rate in plan contributions, cash, or both. On prime contracts over $100,000, hours over 40 in a workweek are paid at least one and one-half times the regular rate (DOL). Check the math with the prevailing wage and fringe calculator.
- Prepare the weekly report on the WH-347 or the state's format.
- Sign the statement of compliance. False statements can be prosecuted under 18 U.S.C. 1001 and 31 U.S.C. 3729.
- Submit it to the agency, owner or prime contractor, every week covered work is performed (or on the state's schedule).
- Keep the records for at least 3 years after all the work on the prime contract is completed (29 CFR 5.5(a)(3)(i)).
Do these steps from the payroll you already run
Upload the payroll report and timesheet your payroll system already exports. PrevailReady checks every worker's pay against the wage determination rates you enter, flags underpayments before you sign, and fills the official 2025 WH-347. Your first weekly report is free, no card needed.
What happens if it is wrong or late
DOL lists the compliance issues that frequently arise on Davis-Bacon projects, including misclassification, not paying the full prevailing wage and fringe for all hours (including overtime), incomplete or inaccurate records, not recording the hours worked in each classification, and failure to submit certified payrolls weekly (DOL Fact Sheet #66). The consequences:
- Withholding: contract payments may be withheld to cover unpaid wages and liquidated damages for overtime violations.
- Termination and debarment: violations may be grounds for contract termination and debarment from future contracts for three years.
- Personal exposure: the person who signs the statement of compliance certifies that the pay was correct; false statements can be prosecuted.
Checking every worker's pay against the wage determination before signing is the cheapest protection.
How much certified payroll costs
- Doing it yourself: DOL's forms are free. The cost is time: DOL estimates 55 minutes to complete one WH-347, every week, for every project.
- Payroll provider reports: some payroll plans include a WH-347 report that you finish yourself.
- Certified payroll software: priced per report or per month; state electronic formats are not always included.
- Outsourced services: a payroll service or consultant prepares the reports for a fee.
PrevailReady's first weekly report is free; after that it is $9 per report or a plan from $49 a month, with the WH-347 and the New York, California, New Jersey and Illinois files included (pricing).
Frequently asked questions
Is certified payroll the same as Davis-Bacon?
No. The Davis-Bacon and Related Acts are the laws that set prevailing wages on federal and federally assisted construction. Certified payroll is the weekly report that shows those wages were paid. State prevailing wage laws also require certified payroll on state public works.
What is certified payroll in construction?
On public construction projects, certified payroll is the weekly report each contractor and subcontractor submits for its laborers and mechanics, showing their classifications, hours and pay against the project's wage determination, with a signed statement of compliance. It is how the agency funding the project checks that prevailing wages were paid.
Who is exempt from certified payroll?
On Davis-Bacon projects the reports cover laborers and mechanics, meaning workers whose duties are manual or physical. People employed in a bona fide executive, administrative or professional capacity (as defined in 29 CFR part 541) are not laborers or mechanics, so they are not listed; forepersons who spend more than 20 percent of a workweek on laborer or mechanic duties are covered for that time (29 CFR 5.2). Contracts of $2,000 or less are not covered by the Davis-Bacon Act.
Is certified payroll the same as prevailing wage?
No. The prevailing wage is the minimum rate and fringe benefits that must be paid for each classification on the project. Certified payroll is the weekly report that proves it was paid. See what prevailing wage means.
What is the difference between payroll and certified payroll?
Payroll is paying your employees. Certified payroll is a weekly report per project, built from the same payroll, that lists each worker's classification, daily hours, rates, deductions and net pay and includes a signed statement of compliance.
Who signs the certified payroll?
The statement of compliance on page 2 of the WH-347 is signed by someone who paid or supervised the payment of the workers, such as the owner or an authorized officer or payroll manager of the contractor.
How long must certified payroll records be kept?
On federal projects, payrolls and basic records must be kept for at least 3 years after all the work on the prime contract is completed (29 CFR 5.5(a)(3)(i)). State rules can require longer.
Is the WH-347 required?
The form itself is optional; the weekly payroll information and the signed statement of compliance are required. Any format with the same information is acceptable on federal projects. States can require their own formats.
Is certified payroll related to the CPP certification?
No. The Certified Payroll Professional (CPP) is a credential for payroll practitioners offered through payroll.org. Certified payroll on prevailing wage projects is a weekly compliance report; no credential is needed to prepare it.