Texas prevailing wage rates and rules

Texas Government Code Chapter 2258 requires prevailing wages for workers on public works built for the state or a political subdivision. There is no statewide rate schedule: each public body sets the rates for its own contract, by its own survey or by adopting the U.S. Department of Labor's Davis-Bacon rates, and must print them in the call for bids and the contract. A contractor that underpays owes a penalty of $60 for each worker for each calendar day.

Updated November 28, 2026 · Sources: Texas Government Code Chapter 2258, Texas Workforce Commission

Texas prevailing wage at a glance

TopicTexas rule
LawTexas Government Code Chapter 2258
Who is coveredLaborers and mechanics employed on a public work by or on behalf of the state or a political subdivision (Sec. 2258.021)
ThresholdNone stated in Sections 2258.001, 2258.002 or 2258.021; maintenance work is excluded
RatesSet by the public body awarding the contract, by its own wage survey or by using the U.S. Department of Labor's Davis-Bacon rates (Sec. 2258.022)
Where the rates areIn the call for bids and in the contract
RecordsEach worker's name, occupation and actual wages paid, open to inspection by the public body (Sec. 2258.024)
Penalty$60 for each worker for each calendar day of underpayment (Sec. 2258.023)
Enforced byThe public body that awarded the contract, then arbitration

Which projects pay prevailing wage in Texas

Under Chapter 2258, a worker employed on a public work by or on behalf of the state or a political subdivision must be paid at least the general prevailing rate of per diem wages for similar work in the locality, and at least the prevailing rate for legal holiday and overtime work (Sec. 2258.021).

  • Public work means construction of a public work, including buildings, highways, roads, excavation and repair work, paid for in whole or in part from public funds (Sec. 2258.002).
  • Worker includes a laborer or mechanic (Sec. 2258.001).
  • Subcontractors owe the same rates as the contractor (Sec. 2258.023).
  • Not covered: maintenance work (Sec. 2258.021(b)), and work done directly by a public utility company under an order of a public authority (Sec. 2258.002(b)).

The sections that define coverage set no minimum contract amount. The chapter covers the state and its political subdivisions, so read the wage clause in each public bid package.

Texas prevailing wage rates: there is no statewide schedule

This is what surprises contractors from other states. Texas does not publish a state rate book. Section 2258.022 gives the job to the public body awarding the contract, which has two options:

  1. Its own survey of the wages received by classes of workers on similar projects in the locality.
  2. The Davis-Bacon rates: the prevailing wage rate determined by the U.S. Department of Labor for the locality. When a public body chooses this, the bid package carries a federal wage determination from SAM.gov.

Either way, the public body must state the rates as a sum certain in dollars and cents and specify them in the call for bids and in the contract itself, and its determination is final (Sec. 2258.022). So the answer to "what is the prevailing wage in Texas?" is: the rates printed in your contract, for your classification and county.

If the contract has no rates. A contractor or subcontractor does not violate the pay requirement if the public body did not determine the prevailing wage rates and specify them in the contract (Sec. 2258.023(c)). Keep the bid documents.

To read a federal wage determination quickly, paste it into the free wage determination reader.

Payroll records and certified payroll in Texas

Chapter 2258 requires a record, not a form. Each contractor and subcontractor keeps a record showing the name and occupation of each worker and the actual per diem wages paid to each, and the record must be open at all reasonable hours to inspection by the officers and agents of the public body (Sec. 2258.024).

The statute does not name a certified payroll form or a filing schedule. The Texas Workforce Commission notes that Texas does not define certified payroll records and that the U.S. Department of Labor's form WH-347 would likely be enough. A public body can ask for more in its contract, such as certified payroll on a set schedule, and projects with federal money require it weekly under Davis-Bacon. Follow your contract.

Asked for a WH-347 on a Texas job?

Upload the payroll report and timesheet your payroll system already exports. PrevailReady checks every worker's pay against the wage determination rates you enter, flags underpayments before you sign, and fills the official 2025 WH-347. Your first weekly report is free, no card needed.

Penalties

  • $60 a day: a contractor or subcontractor that pays less than the specified rates owes the public body $60 for each worker employed for each calendar day, or part of the day, that the worker is underpaid. The public body must put this penalty in the contract (Sec. 2258.023).
  • Small cities: a municipality can collect the penalty only if its population is more than 10,000 (Sec. 2258.023(e)).
  • Criminal offense: a contractor or subcontractor that violates the records requirement commits an offense punishable by a fine of up to $500, up to six months in jail, or both (Sec. 2258.058).

Complaints and arbitration

Chapter 2258 gives enforcement to the public body that awarded the contract:

  1. Complaint: the public body must take up complaints of violations during the contract (Sec. 2258.051).
  2. Initial determination: it decides whether there is good cause to believe a violation occurred before the 31st day after it receives the information, and notifies the contractor and the affected workers in writing (Sec. 2258.052).
  3. Money held: it retains the amounts due under the contract until the matter is finally decided.
  4. Arbitration: if the contractor and the worker have not settled before the 15th day after the initial determination, the issue goes to arbitration under the Texas General Arbitration Act. The public body is not a party (Sec. 2258.053).

Federal projects in Texas

When federal money pays for part of a Texas project, the federal Davis-Bacon rules apply as well: wage determinations from the U.S. Department of Labor, weekly pay and weekly certified payroll with a signed statement of compliance. See the Davis-Bacon Act for contractors and how to fill out the WH-347.

How PrevailReady helps

PrevailReady reads the payroll report and timesheet you already export, checks every worker against the rates in your contract, and builds the federal WH-347, the form the Texas Workforce Commission says would likely be enough as the payroll record.

Frequently asked questions

Does Texas have a prevailing wage law?

Yes. Texas Government Code Chapter 2258 requires contractors and subcontractors on public works for the state or a political subdivision to pay at least the prevailing wage rates the public body specifies in the contract.

Where do I find Texas prevailing wage rates?

In the call for bids and the contract. Texas has no statewide rate schedule; each public body sets rates for its contract, by its own survey or by adopting the U.S. Department of Labor's Davis-Bacon rates for the locality.

What is the penalty for not paying prevailing wage in Texas?

$60 for each worker for each calendar day, or part of the day, that the worker is paid less than the rates in the contract, paid to the public body that awarded the contract.

Is certified payroll required in Texas?

Chapter 2258 requires a record of each worker's name, occupation and actual wages, open to inspection by the public body. It does not name a form. A public body can require certified payroll in its contract, and federally funded projects require it under Davis-Bacon.

Who enforces prevailing wage in Texas?

The public body that awarded the contract. It hears complaints, makes an initial determination before the 31st day after it receives the information, holds back money owed, and unresolved disputes go to arbitration.