Ohio prevailing wage at a glance
| Topic | Ohio rule |
|---|---|
| Law | Ohio Revised Code sections 4115.03 to 4115.16; rules in OAC 4101:9-4 |
| Enforced by | Ohio Department of Commerce, Division of Industrial Compliance, Bureau of Wage and Hour Administration |
| Thresholds (2026) | $250,000 new building construction; $75,000 building reconstruction or repair; $101,201 new road and bridge work; $30,320 road and bridge repair |
| Rates | Determined before bidding and made part of the specifications; redetermined if not awarded within 90 days |
| Certified payroll | To the prevailing wage coordinator within two weeks after the first pay date, then monthly (weekly on contracts of four months or less) |
| Close-out | Sworn, notarized affidavit of compliance before final payment |
| Penalties | Underpayment plus 25% to the worker, a 75% penalty to the state, debarment for 1 year (3 years for a repeat) |
Which projects pay prevailing wage in Ohio
A public improvement is covered when its total overall cost is fairly estimated to be more than the threshold for its type. The Department of Commerce's quick reference gives these figures "As of January 1, 2026" (ORC 4115.03):
| Type of project | Covered above |
|---|---|
| New building construction | $250,000 |
| Building reconstruction, enlargement, alteration, repair, remodeling, renovation or painting | $75,000 |
| New road, street, alley, sewer, ditch and related work | $101,201 |
| Reconstruction or repair of road, street, alley, sewer, ditch and related work | $30,320 |
The road and bridge thresholds are adjusted on January 1 of every even-numbered year, by no more than three percent a year (ORC 4115.034); the building thresholds are set in the statute.
Exemptions. Under ORC 4115.04(B), the law does not apply to, among others, public improvements undertaken by or for the board of education of any school district, those undertaken by or for a port authority, federally funded improvements where federal agencies prescribe predetermined minimum wages, and work done solely with donated labor.
Ohio prevailing wage rates: how much, and where to find them
It depends on the craft and the location. The Ohio Prevailing Wage Portal "contains active, commercial prevailing wage rates for all construction trades in all jurisdictions within the State of Ohio".
- Fixed before bidding: the public authority has the rates determined "before advertising for bids", and the schedule is "attached to and made part of the specifications for the work" (ORC 4115.04).
- 90-day rule: if the contract is not awarded within ninety days, "there shall be a redetermination of the prevailing rate of wages before the contract is awarded" (ORC 4115.05).
- Changes during the contract: when the director finds that a rate has changed, the change takes effect two weeks after the director receives the relevant parts of the new agreement, and the public authority must notify contractors within seven working days of the director's notice.
The prevailing wage coordinator and certified payroll
Each contracting public authority must "designate and appoint one of its own employees to serve as the prevailing wage coordinator" (ORC 4115.071). Contractors and subcontractors send their payroll to the coordinator:
- First report: a certified copy of the payroll "within two weeks after the initial pay date".
- Then monthly: "supplemental reports for each month thereafter".
- Short contracts: if the contract is expected to last no more than four months, the supplemental reports "shall be filed each week after the initial report".
Each payroll shows the employee's name, current address, the last four digits of the Social Security number, daily and weekly hours, hourly rate of pay, job classification, fringe payments and deductions, and is certified by the contractor, subcontractor or its agent. Ohio publishes a certified payroll report form, but its instructions say "The use of this form is not mandatory, employers may submit their own forms."
Before you sign your Ohio certified payroll
Upload the payroll report your payroll system already exports. PrevailReady checks each worker's hours and pay against the rates you enter and flags underpayments before you sign. It doesn't fill in the report you send the coordinator; it makes sure the numbers you enter there are right. Your first weekly report is free, no card needed.
Posting and worker notices
- The rate schedule is posted "in a prominent and accessible place on the site of the work" or on the internet where employees can reach it, for the life of the contract (ORC 4115.07), with the name, address and phone number of the prevailing wage coordinator (OAC 4101:9-4-13).
- Employees not covered by a collective bargaining agreement get an individual written notice of their job classification on the first pay date, and again when it changes (ORC 4115.05).
The affidavit at the end of the job
"Each contractor or subcontractor shall file with the contracting public authority upon completion of the public improvement" "and prior to final payment therefor an affidavit" that it fully complied (ORC 4115.07). "The affidavits shall be sworn to and notarized" (OAC 4101:9-4-12). The Department of Commerce's form is COM1003, Affidavit of Compliance, Prevailing Wages.
Apprentices
"Apprentices will be permitted to work only under a bona fide apprenticeship program if such program exists and is registered with the Ohio apprenticeship council" (ORC 4115.05). Apprentice-to-skilled-worker ratios on the job site may not exceed the ratio in the applicable rate schedule (OAC 4101:9-4-16).
Penalties
- To the worker: the difference between the required rate and the amount paid, "and in addition thereto a sum equal to twenty-five per cent of that difference" (ORC 4115.10).
- To the state: "a penalty to the director of seventy-five per cent of the difference".
- Debarment: a contractor convicted of, or found to have intentionally violated, the law is barred from public contracts for one year; a repeat within five years means three years (ORC 4115.133).
How PrevailReady helps
PrevailReady reads the payroll report and timesheet you already export and checks every worker against the rates you enter, so the payroll you give the coordinator matches the schedule. It builds the federal WH-347 and the New York, California, New Jersey and Illinois files.
Frequently asked questions
What is the prevailing wage threshold in Ohio for 2026?
$250,000 for new building construction and $75,000 for building reconstruction or repair; $101,201 for new road and bridge-type work and $30,320 for its reconstruction or repair, as of January 1, 2026.
Do Ohio school projects pay prevailing wage?
Public improvements undertaken by, or under contract for, the board of education of a school district are exempt from Ohio's prevailing wage law under ORC 4115.04(B). A project with federal money can still be covered by the federal Davis-Bacon rules.
How often is certified payroll due in Ohio?
The first certified payroll is due to the prevailing wage coordinator within two weeks after the first pay date, then monthly. On contracts expected to last four months or less, it is weekly after the first report.
What is the penalty for not paying prevailing wage in Ohio?
The worker recovers the underpayment plus 25% of it, the employer pays the state a penalty of 75% of the underpayment, and intentional violations lead to debarment for one year, or three years for a repeat within five years.
Where do I find Ohio prevailing wage rates?
In the schedule attached to the project specifications, determined before bidding; current rates for all trades are on the Ohio Prevailing Wage Portal at pwr.com.ohio.gov.