Nevada prevailing wage at a glance
| Topic | Nevada rule |
|---|---|
| Law | Nevada Revised Statutes Chapter 338; rules in Nevada Administrative Code Chapter 338 |
| Enforced by | Office of the Labor Commissioner |
| Threshold | Contracts over $100,000 to which a public body is a party (NRS 338.020, 338.080) |
| Rates | Four regions: Clark County, Washoe County, Southern Nevada Rural, Northern Nevada Rural; 2026-2027 rates apply October 1, 2026 to September 30, 2027 |
| Overtime | Time and a half over 8 hours in a day or 40 in a week (NRS 338.020) |
| Certified payroll | Monthly, received by the awarding body within 15 days after the end of the month (NRS 338.070, NAC 338.094) |
| Apprentices | Apprenticeship Utilization Act: 10% of hours on vertical construction, 3% on horizontal (NRS 338.01165) |
| Penalties | $20 to $50 per worker per day, administrative penalties up to $5,000 per violation, disqualification from public works |
Which projects pay prevailing wage in Nevada
The Labor Commissioner's Public Works and Prevailing Wage Handbook states the rule: every contract over $100,000 to which a public body is a party must carry the prevailing wage rates. A public work that costs less than $100,000 is exempt (NRS 338.080), and a unit of a project may not be separated from the total to bring the cost under $100,000.
Before it advertises a public work, the public body requests a PWP number (public works project number) from the Labor Commissioner (NRS 338.013). You will see that number on the bid documents and on your payroll reports.
Nevada prevailing wage rates: how to find yours
Rates are published by region on the Labor Commissioner's 2026-2027 prevailing wage page, which gives the date of determination as October 1, 2026 and the period as October 1, 2026 through September 30, 2027. There are four rate documents:
- Clark County Region
- Washoe County Region
- Southern Nevada Rural Region
- Northern Nevada Rural Region
When this page was written, the Washoe County and Northern Nevada Rural documents were each marked "Amendment 01", so download the current file instead of reusing an older copy. Three rules decide which rates bind your project, according to the Labor Commissioner's overview of NRS 338 for contractors:
- Bid opening fixes the rates. On a competitively bid project, the rates in effect when bids are opened apply, for the region where the project is.
- 36 months. Those rates stay in effect for 36 months or until the project is finished, whichever comes first. A longer project moves to the determination in effect at the 36th month.
- Surveys. The Labor Commissioner surveys contractors in odd-numbered years to set the rates (NAC 338.020).
Overtime and fringe benefits
- Daily and weekly overtime: one and one-half times the prevailing rate for hours over 8 in a workday or over 40 in a scheduled week. A four-day week of 10-hour days is allowed only by mutual agreement, and a collective bargaining agreement can set different overtime terms (NRS 338.020).
- Fringe benefits: part of the wage can be met with bona fide fringe benefits (NRS 338.035). The overview says contributions must go to a third party at least monthly, be annualized, and be documented with a fringe benefit statement.
Certified payroll in Nevada
Nevada's schedule is monthly, not weekly:
- Each calendar month, send a copy of the payroll record for the project to the awarding body. It must be received no later than 15 days after the end of the month (NRS 338.070, NAC 338.094).
- Report project work only: each worker's name, the craft from the wage determination, hours and wages on the project and fringe benefits by the hour, with a signed statement of compliance that refers to NRS 338.
- Add the identification record: each worker's driver's license or identification card number and the state that issued it.
- No work this month? File a non-performance report, also within 15 days after the month ends (NAC 338.098).
- Federal money on the job? Then reports are weekly, as Davis-Bacon requires.
Ask the awarding body whether subcontractors send their reports to it directly or through the prime contractor. The prime contractor also sends a list of its subcontractors to the Labor Commissioner and the awarding body within 10 days after the award.
Before you sign your Nevada certified payroll
Upload the payroll report your payroll system already exports. PrevailReady checks each worker's hours and pay against the rates you enter and flags underpayments before you sign. It uses the overtime hours your time system reports, so make sure that system applies Nevada's 8-hour daily rule. It doesn't fill in the report you send the awarding body; it makes sure the numbers you enter there are right. Your first weekly report is free, no card needed.
Apprentices
- Apprentice pay: an apprentice enrolled in a registered program is paid the rate in the apprenticeship standards, not the journeyman prevailing rate (NRS 338.080). If the required ratio is not met, or the apprentice works without a journeyman of the same craft present, the journeyman rate is owed (NAC 338.0095).
- Apprenticeship Utilization Act: apprentices must work 10% of the hours on vertical construction and 3% on horizontal construction, measured across the project (NRS 338.01165). Requests for apprentices go to the registered program on the Labor Commissioner's form, no more than 30 days before work begins and no later than 5 days after it starts.
Posting
The prevailing wage rates must be posted on the site of the public work where workers can see them (NRS 338.020).
Penalties
- Underpayment: the contractor forfeits not less than $20 nor more than $50 for each worker for each calendar day of underpayment (NRS 338.060). The amount depends on the prime contractor's license limit (NAC 338.120).
- Reports: the same daily range applies to inaccurate or incomplete reports. For late reports or unreported workers the total is capped at $1,000 for a first failure and $5,000 for each later one during the contract.
- Back wages: the wages owed, plus damages equal to those wages for willful and repeated violations (NRS 338.090).
- Administrative penalty: up to $5,000 per violation (NRS 338.015).
- Disqualification from public works (NRS 338.017): up to 180 days for a first offense, up to 3 years for a second, up to 5 years for a third, and at least 5 years after that.
How PrevailReady helps
PrevailReady reads the payroll report and timesheet you already export and checks every worker against the rates you enter, so the payroll you send the awarding body matches the regional rates. On federally funded Nevada projects it builds the federal WH-347.
Frequently asked questions
What is the prevailing wage threshold in Nevada?
$100,000. Public works contracts over $100,000 to which a public body is a party must pay prevailing wage, and a project cannot be split up to get under that amount.
Where do I find Nevada prevailing wage rates for 2026-2027?
On the Office of the Labor Commissioner's website, in four regional documents: Clark County, Washoe County, Southern Nevada Rural and Northern Nevada Rural. The 2026-2027 rates apply from October 1, 2026 through September 30, 2027.
How often is certified payroll due in Nevada?
Monthly. The awarding body must receive the payroll report for each calendar month no later than 15 days after the end of that month. Projects with federal funds report weekly.
Does Nevada have daily overtime on prevailing wage jobs?
Yes. Workers on public works are owed one and one-half times the prevailing rate for hours over 8 in a workday or over 40 in a week, unless a mutually agreed four-day, 10-hour schedule or a collective bargaining agreement applies.
What is the penalty for not paying prevailing wage in Nevada?
A forfeiture of $20 to $50 per worker per calendar day, the back wages, possible damages equal to the wages for willful and repeated violations, administrative penalties of up to $5,000 per violation, and disqualification from public works contracts.